Eriksson, P E, Atkin, B and Nilsson, T (2009) Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(06), 598–611.

Laryea, S and Hughes, W (2009) Commercial reviews in the tender process of contractors. Engineering, Construction and Architectural Management, 16(06), 558–72.

  • Type: Journal Article
  • Keywords: contracts; project evaluation; risk management; United Kingdom
  • ISBN/ISSN: 0969-9988
  • URL: http://www.emeraldinsight.com/10.1108/09699980911002575
  • Abstract:
    Purpose – The purpose of this paper is to show the extent to which clients amend standard form contracts in practice, the locus of the amendments, and how contractors respond to the amendments when putting together a bid. Design/methodology/approach – Four live observational case studies were carried out in two of the top 20 UK construction firms. The whole process used to review the proposed terms and conditions of the contract was shadowed using participant observation, interview and documentary analysis. Findings – All four cases showed strong evidence of amendments relating mostly to payment and contractual aspects: 83 amendments in Case Study 1 (CS1), 80 in CS2, 15 in CS3 and 29 in CS4. This comprised clauses that were modified (37 per cent), substituted (23 per cent), deleted (7 per cent) and new additions (33 per cent). Risks inherent in the amendments were mostly addressed through contractual rather than price mechanisms, to reflect commercial imperatives. “Qualifications” and “clarifications” were included in the tender submissions for post-tender negotiations. Thus, the amendments did not necessarily influence price. There was no evidence of a “standard-form contract“ being used as such, although clients may draw on published “standard-form contracts” to derive the forms of contract actually used in practice. Practical implications – Contractors should pay attention to clauses relating to contractual and financial aspects when reviewing tender documents. Clients should draft equitable payment and contractual terms and conditions to reduce risk of dispute. Indeed, it is prudent for clients not to pass on inestimable risks. Originality/value – A better understanding of the extent and locus of amendments in standard form contracts, and how contractors respond, is provided.

Meldrum, A, Hare, B and Cameron, I (2009) Road testing a health and safety worker engagement tool-kit in the construction industry. Engineering, Construction and Architectural Management, 16(06), 612–32.

Ochieng, E G and Price, A D (2009) Framework for managing multicultural project teams. Engineering, Construction and Architectural Management, 16(06), 527–43.

Pellicer, T M, Pellicer, E and Eaton, D (2009) A macroeconomic regression analysis of the European construction industry. Engineering, Construction and Architectural Management, 16(06), 573–97.

Pewdum, W, Rujirayanyong, T and Sooksatra, V (2009) Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Management, 16(06), 544–57.